Understanding Building Permit Fees in the Town of Brookhaven
When it comes to building or renovating a property in the Town of Brookhaven, understanding the fee structure for permits is crucial. This guide aims to provide you with a comprehensive look at the various fees involved, so you can plan your project budget more effectively.
Types of Fees
Road Improvement Permit
- Initiation Fee: $200.00
Driveway Apron Permit
- Residential: $150.00 per apron
- Commercial: $225.00 per apron
Bell Hole Excavation
- Up to 50 sq. ft.: $150.00 each
- Greater Than 50 sq. ft.: $250.00 each
Drainage Structures
- Fee: $150.00 each
Directional Drill
- First 100 ft.: $150.00
- Thereafter: $1.00/ft.
Test Hole/Monitoring Well
- Fee: $200.00 each
Traffic Signal Loops
- Fee: $100.00 per loop
Excavation
- Up To 60” Depth: $150.00 for 1st 100 ft., $1.50/ft. thereafter
- Greater Than 60” Depth: $175.00 for 1st 100 ft., $1.75/ft. thereafter
Sidewalk Excavation
- Fee: $150.00 for 1st 100 ft., $1.25/ft. thereafter
Curb or Curb & Sidewalk Excavation
- Fee: $150.00 for 1st 100 ft., $1.50/ft. thereafter
Road Access
- Fee: $225.00 each
Road Widening/Extension/Repairs/Repaving
- Fee: $400.00 and $3.00 per linear foot of road to be improved
Communication/Utility Pole Installation or Replacement
- Fee: $150.00 per pole
Emergency Processing Surcharge (utilities only)
- Fee: $50.00 for less than 48 hours notice
Block Party
- Fee: $75.00 each
Re-Inspection Fee
- 2nd inspection: $125.00
- 3rd inspection & each inspection thereafter: $200.00
Permit Renewal Fee (based on length of time expired)
- 1 year: $150.00
- After one year: $175.00 per year expired
- Over 3 years expired: $525.00
Transfer Highway Work Permit to New Permit Holder
- Fee: $150.00 each
Winter Bonding
- Fee: $275.00 each
Encroachment Easement
- Fee: $300.00 each
Street Reports
- Fee: $30.00 per parcel
Boardwalk Access
- Fee: $150.00 each
Beach Ingress/Bulkhead Installation
- Fee: $150.00 each
Heavy or Overweight Loads (80,000 lbs. or more)
- Fee: $250.00 each
Over Width Loads (more than 10 feet wide)
- Fee: $250.00 each
Banner Permit
- Fee: $25.00 each
Understanding the fee structure for building permits in the Town of Brookhaven is essential for effective budget planning. Always make sure to check the most recent fee schedule to avoid any surprises.
Expedite Your Permit Process with TracisPermits
If you find the permit process overwhelming or simply don’t have the time to navigate through it, TracisPermits can help. We specialize in expediting the permit process, ensuring that you get the approvals you need without the hassle.
Why Choose TracisPermits?
- Expertise: Our team has years of experience in dealing with the intricacies of the permit process.
- Time-saving: We handle all the paperwork and follow-ups, saving you valuable time.
- Peace of Mind: With TracisPermits, you can focus on your project while we take care of the permits.
How to Contact Us
Ready to make your permit process a breeze? Contact us through our contact page and let us take the stress out of securing your building permits.
Conclusion
Whether you decide to navigate the permit process yourself or choose to expedite it with TracisPermits, understanding the fee structure is crucial. Always refer to the most recent fee schedule to avoid any surprises.